GES is pleased to introduce our new Field and Laboratory Manager, Mr. Scott Kassel, PE.  Scott enhances the GES team with over 18 years of industry experience.  He has served as  a Clark County approved Quality Manager, and has managed construction inspection and materials testing projects ranging from large scale projects such as the Cardinals Stadium.. read more →

GES was contracted to provide a  Phase I Environmental Site Assessment for one (1) parcel of land located at 524 South Main Street, Las Vegas, Clark County, NV; APN 139-34-302-007. GES performed a standard Phase I Environmental Site Assessment (ESA) for the site in general accordance with the “ASTM E 1527-05 Standard Practice for Phase.. read more →

GES was contracted by the City of North Las Vegas to provide a Phase 1 Environmental Site Assessment for an approximately 0.65 miles corridor along Colton Avenue (N. 5th Street to I-15).  GES performed the Phase 1 ESA in general accordance with ASTM E 1527-05, excluding lead based paint, lead in drinking water, asbestos containing material.. read more →

08 Feb 2013
February 8, 2013

AMPAC Annual Groundwater Sampling

0 Comment

GES is providing off-site and on-site annual groundwater monitoring well sampling for the AMPAC Henderson In-Situ Bioremediation Plant located at 900 Wiesner Way, Henderson, NV 89011. GES is performing groundwater sampling which will not exceed more than 240 groundwater monitoring wells.  The groundwater sampling program is divided to to four tasks, which include: Task 1.. read more →

GES provided Phase I Environmental Site Assessments (ESA) for two separate locations.  The Pahrump site consisted of twenty four parcels totalling 1,205 acres.  The site located in North Las Vegas consisted of four parcels totalling 141 acres.  The Phase I ESA was in general accordance with ASTM 1527-05, excluding lead based paint, lead in drinking water, abestos.. read more →