GES provided Phase I Environmental Site Assessments (ESA) for two separate locations.  The Pahrump site consisted of twenty four parcels totalling 1,205 acres.  The site located in North Las Vegas consisted of four parcels totalling 141 acres.  The Phase I ESA was in general accordance with ASTM 1527-05, excluding lead based paint, lead in drinking water, abestos.. read more →

Client: American West Development EPOXY OBSERVATIONS  GES observes installation of adhesive anchorages with epoxy resin on houses built on post-tensioned slab foundations at any American West Development projects in Clark County as required in QAA Agreement. We evaluate the cleanliness of drilled holes in the concrete.  We also evaluate that the drilled depths and diameters.. read more →

Clients: Pulte Homes/KB Homes/DR Horton GES performed Phase I, Geotechnical as well as Materials and Testing Services at Aliante, North Las Vegas, which included these projects:   La Vella   Salerno   Club Aliante Gate House   Serenata   Aliante 18   Terrasini   Pavona   Treviso   La Vella   Vialletto   Aliante 18.. read more →

Client: Pulte Homes/Del Webb Anthem @ Mesquite 2000-Acre Master Planned Community Mesquite, Nevada- GES provided general subsurface soil conditions and geology, site grading and earthwork, including hillside grading. Evaluated engineering properties of the soils, which will influenced the design of the future structures, including: bearing capacity, settlement potential, lateral earth pressures, foundation design criteria, groundwater.. read more →